Project Highlights
Architects
ABDR Architetti Associati
Build Type
New Build
Seating capacity
1100
Services Provided
Stage engineering
Completion
2012
Value
£70 Million
To work with the architects concrete building design Theatreplan designed fully integrated rigging and technical services within the building shell.
Theatreplan worked with acousticians Müller-BBM and Biobyte, to create the perfect operatic environment for Florence’s new opera house.
There are four stages on a cruciform pattern with wagons, stage elevators, safety curtain, power flying and a flexible orchestra pit included in the technical design.
The project ensures the highest quality required for a modern musical complex.